Redondo Beach · Los Angeles · SoCal

Nivasa: 401-417 South Pacific Coast Highway

Approved

401-417 S. Pacific Coast Highway, Redondo Beach, CA 90277

Project type
Mixed-Use
Units proposed
49
Date denied
December 18, 2025
Delay
2 months
Download brief (print to PDF)Redondo Beach profileUse the data

Redondo Seaside Living LLC proposed Nivasa, a four-story, 45-foot mixed-use building on the west side of Pacific Coast Highway between Pearl and Ruby streets, at 401 to 417 S. Pacific Coast Highway in the coastal zone (city permit 2025-0074). The plan has 49 apartments, eight of them affordable (five very low income and three moderate income), about 17,000 square feet of ground-floor commercial space and a two-level underground garage. It relies on the State Density Bonus Law and AB 2011, which AB 2243 extended to qualifying coastal sites. On December 18, 2025 the Planning Commission unanimously denied the coastal development permit and two of three requested density bonus concessions, citing parking, coastal access and safety; one rejected concession would have cut commercial parking from 68 to 44 spaces. The developer appealed on December 22. On February 13, 2026 HCD wrote that the denial conflicted with AB 2011 and the Density Bonus Law, in a letter that also served as a notice of potential violation. Four days later the City Council granted the appeal unanimously and approved the project. Mayor Jim Light said that under current state law, "with residential, we don't have a say anymore." The decision came after an October 2025 appellate ruling that Redondo Beach's housing element did not comply with state law; HCD found a revised element compliant on May 20, 2026. The filing date was not found, and no construction start has been reported.

Talk to this project

Ask a question to begin.

Press Enter to send · Switch personas to start a new conversation

Timeline

October 10, 2025Appeals Court Finds Redondo Housing Element Noncompliant

The court rejects the city's overlay strategy, the backdrop for the PCH decision.

Court of Appeal
December 18, 2025Planning Commission Denies 49-Unit PCH Project

Unanimous denial of the coastal development permit and two of three density bonus concessions, citing parking, coastal access and safety.

City of Redondo Beach
December 22, 2025Developer Appeals to City Council

Redondo Seaside Living LLC appeals the denial.

HCD
February 13, 2026State Warns Denial Violates Housing Law

HCD says the denial conflicts with AB 2011 and the Density Bonus Law; the letter is also a notice of potential violation.

HCD
February 17, 2026Council Overturns Denial, Approves Project

The council grants the appeal unanimously.

Easy Reader
May 20, 2026State Certifies Revised Redondo Housing Element

City attorney Joy Abaquin-Ford: "The city is not subject to Builder's Remedy with the newly certified Housing Element."

Easy Reader

Who was involved

Supporting
Redondo Seaside Living LLC
Applicant and appellant

Appealed the Planning Commission denial on Dec. 22, 2025, submitting a traffic study and adding safety and mobility measures.

California Department of Housing and Community Development
State of California
Issued a letter of technical assistance and notice of potential violation (Feb. 13, 2026)

Melinda Coy: "denial of the Project is inconsistent with state housing law."

Opposing
Redondo Beach Planning Commission
Denied the coastal development permit and two concessions unanimously (Dec. 18, 2025)

Cited parking, coastal access and safety.

Gale Hazeltine
Redondo Beach Planning Commission
Planning commissioner

"It's short 24 spaces." Also: "The city can't absolve itself of its responsibility to preserve access to the beach"

Deciding
Brad Waller
Redondo Beach City Council
Council member; voted to approve

"Sacramento is forcing our hands here. That is where my vote is coming from."

Jim Light
City of Redondo Beach
Mayor; voted to approve

"My interpretation of the (current state law) is, with residential, we don't have a say anymore."

Neutral
Marc Wiener
City of Redondo Beach
Community development director

"Previously, a city could use subjective design standards (to deny a project), such as neighborhood compatibility."

How it was obstructed

Parking MinParking Minimums
Invoked by Redondo Beach Planning Commission · December 18, 2025

The commission refused the concession reducing commercial parking from 68 to 44 spaces. The council reversed it on Feb. 17, 2026.

Obstruction failedAdded 2 months of delay
Invoked by Redondo Beach Planning Commission · December 18, 2025

The commission denied the coastal development permit on coastal-access, fire-station access and driveway findings; HCD said AB 2011 required approval. Reversed on appeal.

Obstruction failedAdded 2 months of delay

Decisions

Each row is a dated action by a deciding body, taken from the minutes, agenda packet, video, or ruling linked in the source column.

DateBodyActionVoteStaff recommendationSource
December 18, 2025Planning Commissiondenied
Denied the coastal development permit and two of three density bonus concessions. The vote was unanimous; the tally was not reported.
—UnknownCity of Redondo Beach
February 17, 2026City Councilappeal upheld
Granted the developer's appeal and approved the project. The vote was unanimous; the tally was not reported.
—UnknownEasy Reader

Sources

Major development projects